Date: 7/29/2003 |
|
Instrument Panel Catch-Up
|
|
Here
is what I have been doing with the instrument panel for the past 2
months. I have designed and installed my complete electrical system.
Here is a progression of photos.
|
|
Task Hours: 26
|
|
Date: 7/30/2003 |
|
More electrical follow-up
photos |
|
Positive
and Ground Busses.
|
|
Task Hours: 0
|
|
Date: 8/1/2003 |
|
More electrical follow-up
|
|
Main
Positive to starter.
|
|
Task Hours: 2
|
|
Date: 8/2/2003 |
|
Closeups of switches and
contactors |
|
Above
and below switches and both contactors.
|
|
Task Hours: 0
|
|
Date: 8/16/2003 |
|
Installed Dash Pad
|
|
Installed
Dash Pad and checked fit.
|
|
Task Hours: 2
|
|
Date: 8/17/2003 |
|
Installed EFIS and EIS
and Powered up |
|
Installed radio stack visor and
applied first power
to the system and tested EFIS and EIS.
|
|
Task Hours: 2
|
|
Date: 3/2/2004 |
|
Dash and Consoles
Installed |
|
Installed
dash and overhead console with instruments.
|
|
Task Hours: 4
|
|
Date: 3/2/2004 |
|
EFIS Lite CF card access |
|
Modified
the top of my
Blue Mountain EFIS Lite for easy access to the Compact
Flash card for updates, just in case the FTP ability is too much of a
pain.
|
|
Task Hours: 1
|
|
|
Date: 9/25/2004 |
|
EFIS Lite Remote Control |
|
Installed the remote control switch assembly to my switch panel.
|
|
Task Hours: 1
|
|
|
Date: 10/02/2005 |
|
Wing Electrical and Relay
Holder |
|
Fabricated
brackets to span gear leg openings and support electrical. Also
fabricated relay mounting bracket and installed.
|
|
Task Hours: 6
|
|
Date: 10/15/2005 |
|
EFIS Lite Magnetometer
Mount |
|
Fabricated bracket to install magnetometer behind upper baggage
bulkhead. Routed cable and installed magnetometer on new bracket.
|
|
Task Hours: 4
|
|