Date: 1/17/2001 |
|
Landing Gear |
|
Began finish
sanding the landing gear legs. This is in preparation for installing
them, hopefully, for the last time. (those famous last words,
again...this is the first set I installed)
|
|
Task Hours: 1
|
|
Date: 11/30/2001 |
|
Mounted gear to fuselage
|
|
Mounted gear
to fuselage. Yes, that is a shower curtain rod used as the temporary
compression strut.
|
|
Task Hours: 1
|
|
Date: 12/1/2001 |
|
Rechecked alignment after
gear installed. |
|
Rechecked alignment after gear installed. (little
did I know that, near the end of this project, I could be considered a professional
at this task)
|
|
Task Hours: 1
|
|
Date: 12/2/2001 |
|
Installed axles, wheels
and tires. |
|
Installed
axles, wheels and tires.
|
|
Task Hours: 1
|
|
Date: 12/6/2001 |
|
More Tail Wheel Work
|
|
Welded tail wheel lock release pin. Measured, marked
and cut tail wheel fairing to begin installation. Remounted main gear
and drilled new "second" hole in upper fuselage sidewall. Fabricated
U-washer for forward tail wheel mounting hole.
|
|
Task Hours: 2
|
|
Date: 12/8/2001 |
|
Laminated Halves of
Tailwheel Fairing |
|
Sanded, aligned, taped and applied a two layer
laminate to the forward portion of the two tail wheel fairing halves.
|
|
Task Hours: 1
|
|
Date: 12/9/2001 |
|
Final Main Gear Work
|
|
Laminated two-layer laminate to inside of upper main
gear attach points to cover old holes. Fabricated spacer for left upper
main gear mount to properly position in relation to right main gear.
Measured and ordered all new bolts and nuts for main gear mounts due to
difference in thickness of Grove gear.
|
|
Task Hours: 2
|
|
Date: 12/20/2001 |
|
Bonded Tailwheel Strut
|
|
Laminated
two-layer laminate to inside of upper main gear attach points to cover
old holes. Fabricated spacer for left upper main gear mount to properly
position in relation to right main gear. Measured and ordered all new
bolts and nuts for main gear mounts due to difference in thickness of
Grove gear. (this is the second set of three that I had the
pleasure to install :-)
|
|
Task Hours: 2
|
|
Date: 12/22/2001 |
|
Tailwheel Fairing
|
|
Trimmed, aligned, trimmed, aligned.... tail wheel fairing. Drilled holes and installed
nut plates for upper 1/2 of tail wheel fairing.
|
|
Task Hours: 3
|
|
Date: 12/23/2001 |
|
Tailwheel Fairing
|
|
Finished fitting upper portion of tailwheel fairing
with trimming for rudder clearance. Jigged and drilled lower fairing.
Drilled for all nutplates and countersunk nut plate rivet holes. removed
all landing gear hardware for powder coating.
|
|
Task Hours: 4
|
|
Date: 12/24/2001 |
|
Tailwheel Fairing
|
|
Laminated front and rear of lower tailwheel fairing.
Taped upper fairing for preparation of two layer flange laminate.
|
|
Task Hours: 1
|
|
Date: 12/29/2001 |
|
Tail Wheel Fairing
Reinforcement |
|
Laminated 2-layer reinforcements at each bolt
location on both tail wheel fairings.
|
|
Task Hours: 1
|
|
Date: 2/10/2002 |
|
Installed Main Gear
|
|
Installed
main gear and compression strut.
|
|
Task Hours: 4
|
|
Date: 2/11/2002 |
|
Installed Tailwheel
|
|
Installed tail wheel
parts.
|
|
Task Hours: 1.5
|
|
Date: 2/17/2002 |
|
Wrapped Landing Gear
|
|
Applied foam wrap to
landing gear. |
|
Task Hours: 0.5
|
|