Tail Wheel Fairing
|
|
Cleaned up three upper tail wheel fairing half attach
flanges. Sanded upper seam line smooth.
|
|
Task Hours: 0.5
|
|
Date: 2/9/2003 |
|
Landing Gear Completion
|
|
Removed landing gear and had them stripped... again.
The powder-coating did not stick real well. We had a temperature limit
on the oven due to the spring gear and I believe that is why it flaked
off so easy. This time I had them gold anodized. Not as special
looking, but, it'll get me in the air.
|
|
Task Hours: 6
|
|
Date: 2/24/2003 |
|
Tail Wheel Lock Cable
|
|
Fabricated guide block for tail wheel release at
vertical stabilizer shear web and mounted it. Attached cable at tail
wheel lock assembly. Ran cable into baggage area.
|
|
Task Hours: 2
|
|
Date: 3/14/2003 |
|
Tail Wheel Lock Control
|
|
Fabricated
lever and mount for tail wheel lock control.
|
|
Task Hours: 2
|
|
Date: 1/23/2005 |
|
Removed Landing Gear and
Tail Wheel |
|
I started the tail dragger to fixed tricycle gear swap
today by removing the Grove main landing gear and the tail wheel
assembly. The gear was purchased from me for a Glasair FT in
California. He is converting his airplane to a TD. My FT parts are
supposed to arrive in the next week or so. (here goes the third
set...)
|
|
Task Hours: 8
|
|
Date: 2/3/2005 |
|
FT Parts Arrived
|
|
I received the nose gear and both main landing gear
struts today. I am still waiting for the b-rib brackets to arrive. I
spent about an hour fitting up the nose gear leg and getting an idea of
what will need to be modified to make it fit the Subaru engine mount.
|
|
Task Hours: 1
|
|
Date: 2/12/2005 |
|
Cleared The Way For The
Conversion |
|
Landing gear conversion is now being recorded on the
FT Conversion page.
|
|
|
Task Hours: 40 |
|
Date: 8/27/2005 |
|
Back to work assembling
the plane |
|
I made new splice plates for the axle mounting points
today. I decided to strip the old gear legs of all the milled fiber and
sand the original shape back at the splice plate location to allow for
resetting the camber and toe of the axles. Next I mixed a large batch of
milled-fiber and resin, filled the old holes and mounted the splice
plates. I used feeler gauges to shim the splice plates in place setting
the camber to 9deg and the toe to 1deg toe in. Once clamped I left them
overnight to cure.
The next morning I re-drilled the new axle holes using the axle as a
guide. After mounting the axles I trimmed the splice plates and legs to
fit the calipers.
I did all of my adjustments and height setting during all of these
procedures by setting the gear legs down on steel plates with casters
mounted to them that allowed them to relax into the proper position.
|
|
Task Hours: 10
|
|
Date: 9/3/2005 |
|
New Brake Lines |
Fabricated new brake lines for the FT gear today. The large
(3/16" ID) Nylaflow tubing was installed per the manual by the
previous owner of the gear. I used this to install a section of
3/16" aluminum tubing from the top bolts of the lower splice plate
to the B-rib bracket under the main gear. I made up a small aluminum
angle bracket at the lower splice plate for a -3 bulkhead fitting and a
flat plate at the forward bolt holes of the B-rib bracket for a similar
fitting. I used a short section of stainless braided Teflon hose for
both the caliper to splice plate bulkhead fitting and upper B-rib
fitting to the front brake line bulkhead in the fuselage.
|
|
Task Hours: 12
|
|
|
Date: 9/10/2005 |
|
Nose Gear Failsafe |
Fabricated cable and
backup system for nose gear shock bushing support.
|
|
Task Hours: 2
|
|
Date:
4/6/2007 |
|
Main Gear Wheel Pants |
Fabricated
wheel pant attach brackets and modified wheel pants to fit the FT gear
legs.
|
|
Task Hours: 8
|
|
Date:
4/14/2007 |
|
Main Gear Wheel Pants |
Used
modeling clay to shape wheel pant bracket fairings.
|
|
Task Hours: 6
|
|
Date:
4/28/2007 |
|
Nose Gear Wheel and Tire |
Disassembled
the nose gear wheel and tire to replace the tire and tube that came on
the used gear leg. Cleaned all of the parts, replaced the axle bolt and
wheel nuts, re-greased the wheel bearings and installed new tire
and tube. |
|
Task Hours: 1
|
|
Date:
4/28/2007 |
|
Nose Gear Wheel Pant |
Fitted
front wheel pant to nose wheel. Applied reinforcement laminates to
attachment areas. Mounted nose pant/tow bar bracket. Drilled forward
mounting holes and bonded foam spacers inside of rear attachment points. |
|
Task Hours: 1
|
|
Date:
5/12/2007 |
|
Nose Gear Wheel Pant |
|
Finished fitting nose gear wheel pant. Installed nutplates and screws
and installed on nose gear |
|
Task Hours: 3
|
|
Date:
5/13/2007 |
|
Main Gear Wheel Pants |
Finished
sculpting clay for wheel pant covers. Laminated 4-layer cloth over clay. |
|
Task Hours: 4
|
|